Anyone planning a home in Lucknow has seen the adverts: a very low rate per sq ft, in large type. Some of those rates are real. The trouble is that a rate on its own tells you almost nothing. What matters is what the rate is for.
A rate is only a number until you know the scope
There are two very different things a builder can quote per sq ft. One is the structure only: foundation, columns, beams, slabs and brickwork, left ready for your own finishing. The other is a finished home with flooring, doors, windows, electrical work, plumbing and paint.
At NextAwas the two are priced separately, so they cannot be confused. Civil Structure is ₹1,199 per sq ft and is the structure only. A finished home starts at ₹1,699 per sq ft in the Essential package, then ₹1,999 in Premium and ₹2,599 in Luxury, which starts at 4,000 sq ft. GST is extra on all of them.
So when an advert shows a low figure, the first question is simple: is this for the structure, or for a home you can move into?
Five things that change what a rate really means
| Ask this | Why it matters |
|---|---|
| Is it structure only, or a finished home? | The difference is several hundred rupees per sq ft. |
| How is the area measured? | The same house can be billed at different areas. We count the complete slab, including any open-to-sky cut-out, and measure the staircase twice, and we say so before work starts. |
| Is GST inside the rate or on top? | With us GST is extra and is charged on the total billing. A rate that hides this is not comparable. |
| What is charged extra? | Boring, septic tank, extra elevation work, roof waterproofing and anti-termite treatment are common extras. Ask for the list in writing. |
| Which grades and brands does the rate assume? | Cement, steel, concrete grade, wiring and fittings decide how the house behaves in ten years, not on handover day. |
Where a very low rate usually saves money
- Lower grades of steel and cement.
- Thinner wiring and cheaper pipes inside the walls, where you cannot see them.
- No waterproofing where it is needed.
- No engineer on site, so nobody checks the work before it is covered up.
None of this shows on the day you move in. It shows later as seepage, cracks and electrical faults, and repairs inside a finished home cost far more than doing the work properly the first time.
How to compare two quotations fairly
- Put both on the same built-up area, measured the same way.
- Put both on the same scope: structure only, or finished.
- Add GST to both.
- Add the extras each one leaves out.
- Ask who checks the work at each stage, and whether the checks are recorded. NextAwas builds the structure under BRIX-108™, its standard of 108 recorded quality checks.
Only after these five steps are two rates really side by side.
See what each package includes, or ask for an estimate for your plot.