The first question every family asks is what a home costs per sq ft. The honest answer has two parts: the rate, and what that rate covers. This guide uses the NextAwas package rates as they stand on the day it was published.
The four rates
| Package | Rate per sq ft | What it is |
|---|---|---|
| Civil Structure | ₹1,199 | Structure only, ready for your own finishing. |
| Essential | ₹1,699 | A finished home with standard fittings. |
| Premium | ₹1,999 | Better fittings, more ceilings and glass railing. |
| Luxury | ₹2,599 | Wall-hung fittings, frameless glass and extras on every floor. Minimum built-up area 4,000 sq ft. |
All rates are per sq ft of built-up area. GST is extra and is charged on the total billing.
What that means for a whole home
| Built-up area | Civil Structure | Essential | Premium |
|---|---|---|---|
| 1,000 sq ft | ₹12.0 lakh | ₹17.0 lakh | ₹20.0 lakh |
| 1,500 sq ft | ₹18.0 lakh | ₹25.5 lakh | ₹30.0 lakh |
| 2,000 sq ft | ₹24.0 lakh | ₹34.0 lakh | ₹40.0 lakh |
Luxury starts at 4,000 sq ft, which comes to ₹104.0 lakh before GST. These are rate multiplied by area; your own figure depends on your plot and plan.
What the rate covers
The rate covers material, conveyance, loading and unloading at site, labour and work supervision, for the work shown in the drawing and listed in your package.
What is charged extra
- Work beyond what the drawing shows.
- Extra elevation work and roof waterproofing.
- Septic tank and soak pit, if required.
- Boring, if needed.
- Plinth level above 2 ft, and floor height above 10 ft.
- Anti-termite treatment.
- Government and development authority charges.
How the area is measured
The complete slab, including any open-to-sky cut-out, is counted for billing, and the staircase is measured twice. Ask for this to be written in your agreement, with any builder, so the area on the bill is never a surprise.
How to compare two quotations
- Check that both are for the same built-up area, measured the same way.
- Ask what is included and what is extra, in writing.
- Ask whether GST is inside the rate or on top of it.
- Ask which brands and grades of cement, steel and fittings the rate assumes.
- Ask who checks the work at each stage, and whether those checks are recorded.
See what each package includes, or ask for an estimate for your plot.