Construction packages
Four packages. The rate is fixed before the first pour.
One rate per sq ft covers material, labour, transport and supervision. No hidden charges.
GST extra on all packages.
Every package comes with a client portal login to track your home. Get a detailed estimate from the cost calculator
Quick view
What each package includes.
| What you get | Civil Structure₹1,199 / sq ft | Essential₹1,699 / sq ft | Premium₹1,999 / sq ft | Luxury₹2,599 / sq ft |
|---|---|---|---|---|
| Scope of work | Foundation, brick work, slab, door frames (chaukhat), electrical and plumbing piping, plaster | Structural work, tiles, paint and putty, doors and windows | Structural work, tiles, paint and putty, doors and windows | Structural work, tiles, paint, putty and primer on walls, doors and windows |
| Washroom fittings | – | Water mixers | Water diverters | Water diverters |
| Washbasin tap | – | One-way tap | Water mixer | Water diverter |
| Toilet seat | – | Two-piece | One-piece | Wall-hung |
| Washbasin, per washroom | – | 1 wall-hung | 1 wall-hung, under-counter | 1 wall-hung, under-counter, with cabinet |
| Washbasin, common area | – | 1 pedestal, one-way tap | 1 counter-top with water mixer and cabinet, per floor | 1 counter-top with water diverter and cabinet, per floor |
| Fabrication works | – | |||
| Balcony railing | – | MS railing | Framed SS glass railing | Frameless SS glass railing |
| Electrical and plumbing fittings | – | |||
| Main gate | – | Up to ₹25,000 | Up to ₹35,000 | Up to ₹70,000 |
| False ceiling | – | POP work, 1 per floor | 3 per floor | Across the floor, except bath and water-exposure areas |
| Wardrobe | – | 1 per floor, up to 10×4 | 1 per floor, up to 10×6 | 2 per floor, up to 10×7.5 |
| Modular kitchen | – | 1 | 1 | 1, with 1 pantry cabinet |
| Wallpaper | – | 1 | 2 | 2 per floor |
| POP cornice work | – | – | – | Optional |
| TV cabinet | – | – | – | 1 per floor |
| Wall moulding | – | – | – | 1 wall per floor |
| Wall-hung lights | – | – | – | 2 per floor |
| Profile lights in false ceiling | – | – | – | 2 per floor |
This is the quick view. Material grades, brands and per-item limits are in the detailed comparison your engineer shares with the quotation.
Estimate
Move the slider. See all four.
Area × rate. GST extra. Final billing is on measured slab area; the staircase is measured twice.
Payment schedule
You pay as the home goes up.
- Advance
- At lintel level
- Before slab
- PVC and CPVC stage (electrical and plumbing)
- Start of plaster work
- Flooring
- Finishing work
Important notes
What is extra, written down.
- Furniture, curtains, modular kitchen or bathroom work, wardrobes, crockery shelves, decorative lighting, interior decoration, landscaping and garden work beyond what your package lists are charged extra.
- The rate covers material, conveyance, loading and unloading at site, labour and work supervision. There are no hidden charges.
- Work beyond what the drawing shows is done at actual cost plus 10% contractor profit.
- Electric and water connections are the owner's responsibility. Boring, if needed, is charged at the boring contractor's cost.
- Extra elevation work and roof waterproofing are charged at item rate.
- Parapet between column and plaster work is charged extra at item rate.
- Septic tank and soak pit, if required, are charged extra.
- All legal and government liabilities (development authority and government bodies) are borne by the client.
- Plinth level above 2 ft is charged extra.
- Floor height above 10 ft from finished floor level is charged extra.
- Two bathrooms are included in the cost. Extra bathrooms are charged extra.
- The staircase is measured twice.
- The complete slab, including OTS, is counted for billing.
- Toughened glass railing, on demand, is charged additionally.
- False ceiling above 2 layers is charged extra.
Home construction loan assistance
We help with the loan too.
Building a home is a big financial decision. We connect you with the right bank and coordinate the paperwork, for a new house, an added floor or a renovation.
We do not charge any extra fee for loan assistance. Our role is to guide you, coordinate documentation and help the approval go smoothly.
- Guidance on eligible loan amount
- Construction-linked disbursement support
- BOQ and cost estimation for bank approval
- Document coordination
- Bank liaison and follow-ups
- Faster and smoother processing
Brands we use
Ready to start your project?