Construction packages

Four packages. The rate is fixed before the first pour.

One rate per sq ft covers material, labour, transport and supervision. No hidden charges.

LUXURY

GST extra on all packages.

Every package comes with a client portal login to track your home. Get a detailed estimate from the cost calculator

Quick view

What each package includes.

What you getCivil Structure₹1,199 / sq ftEssential₹1,699 / sq ftPremium₹1,999 / sq ftLuxury₹2,599 / sq ft
Scope of workFoundation, brick work, slab, door frames (chaukhat), electrical and plumbing piping, plasterStructural work, tiles, paint and putty, doors and windowsStructural work, tiles, paint and putty, doors and windowsStructural work, tiles, paint, putty and primer on walls, doors and windows
Washroom fittings–Water mixersWater divertersWater diverters
Washbasin tap–One-way tapWater mixerWater diverter
Toilet seat–Two-pieceOne-pieceWall-hung
Washbasin, per washroom–1 wall-hung1 wall-hung, under-counter1 wall-hung, under-counter, with cabinet
Washbasin, common area–1 pedestal, one-way tap1 counter-top with water mixer and cabinet, per floor1 counter-top with water diverter and cabinet, per floor
Fabrication works–
Balcony railing–MS railingFramed SS glass railingFrameless SS glass railing
Electrical and plumbing fittings–
Main gate–Up to ₹25,000Up to ₹35,000Up to ₹70,000
False ceiling–POP work, 1 per floor3 per floorAcross the floor, except bath and water-exposure areas
Wardrobe–1 per floor, up to 10×41 per floor, up to 10×62 per floor, up to 10×7.5
Modular kitchen–111, with 1 pantry cabinet
Wallpaper–122 per floor
POP cornice work–––Optional
TV cabinet–––1 per floor
Wall moulding–––1 wall per floor
Wall-hung lights–––2 per floor
Profile lights in false ceiling–––2 per floor

This is the quick view. Material grades, brands and per-item limits are in the detailed comparison your engineer shares with the quotation.

Estimate

Move the slider. See all four.

Area × rate. GST extra. Final billing is on measured slab area; the staircase is measured twice.

Civil Structure–
Essential–
Premium–
Luxury–

Payment schedule

You pay as the home goes up.

  • Advance
  • At lintel level
  • Before slab
  • PVC and CPVC stage (electrical and plumbing)
  • Start of plaster work
  • Flooring
  • Finishing work

Important notes

What is extra, written down.

  1. Furniture, curtains, modular kitchen or bathroom work, wardrobes, crockery shelves, decorative lighting, interior decoration, landscaping and garden work beyond what your package lists are charged extra.
  2. The rate covers material, conveyance, loading and unloading at site, labour and work supervision. There are no hidden charges.
  3. Work beyond what the drawing shows is done at actual cost plus 10% contractor profit.
  4. Electric and water connections are the owner's responsibility. Boring, if needed, is charged at the boring contractor's cost.
  5. Extra elevation work and roof waterproofing are charged at item rate.
  6. Parapet between column and plaster work is charged extra at item rate.
  7. Septic tank and soak pit, if required, are charged extra.
  8. All legal and government liabilities (development authority and government bodies) are borne by the client.
  9. Plinth level above 2 ft is charged extra.
  10. Floor height above 10 ft from finished floor level is charged extra.
  11. Two bathrooms are included in the cost. Extra bathrooms are charged extra.
  12. The staircase is measured twice.
  13. The complete slab, including OTS, is counted for billing.
  14. Toughened glass railing, on demand, is charged additionally.
  15. False ceiling above 2 layers is charged extra.

Home construction loan assistance

We help with the loan too.

Building a home is a big financial decision. We connect you with the right bank and coordinate the paperwork, for a new house, an added floor or a renovation.

We do not charge any extra fee for loan assistance. Our role is to guide you, coordinate documentation and help the approval go smoothly.

Home construction loanPlot + construction loanFloor extension loanHome renovation loan
  • Guidance on eligible loan amount
  • Construction-linked disbursement support
  • BOQ and cost estimation for bank approval
  • Document coordination
  • Bank liaison and follow-ups
  • Faster and smoother processing

Brands we use

JaquarKajariaKohlerSupremeDr. FixitAction TesaOrient ElectricTata Tiscon SDParrywareGallanttSomanyUltraTechACCJohnsonAsian PaintsHavellsAnchor by PanasonicAstralGoldmedalCenturyPlyNerolacBergerWeathersealGyprocGodrej LocksJaquarKajariaKohlerSupremeDr. FixitAction TesaOrient ElectricTata Tiscon SDParrywareGallanttSomanyUltraTechACCJohnsonAsian PaintsHavellsAnchor by PanasonicAstralGoldmedalCenturyPlyNerolacBergerWeathersealGyprocGodrej Locks

Ready to start your project?

Pick a package. We will do the maths with you.

Get Construction Estimate
Call +91 90269 63653Email info@nextawas.com
WhatsApp